Bethlehem Lutheran ChurchBethlehem Lutheran Church & School
Lakewood, Colorado

Client
Bethlehem Lutheran Church & School
2100 Wadsworth Blvd.
Lakewood, CO 80214
Owner’s Rep: Jim Wolf (303) 885-6938

Owner's Rep:
Strategy Group
1830 Blake St.
Denver, CO 80202
Charlie Johnson (303) 968-7485

Project Information
Use: New Commons and School Admin.
Type: New Construction and Renovation
Size: 20,000 SF New and 20,000 SF Remodel
Contract Amount: $3,790,000
Project Duration: September 2013 through December 2014
Project Manager: Paul Sommer
Superintendent: Greg Thompson
Method of Delivery: CM/GC

Project Address
Bethlehem Lutheran Church
2100 Wadsworth Blvd.
Lakewood, CO 80214

Description
Ward Construction Co. was selected as the CM/GC as the construction documents were just starting. Ward kept the construction on schedule. The main challenge of this project was integrating a new center Commons addition that is surrounded by 4 additions built over the last 6 decades integrating 4 different building levels. We also were able to deliver 5,000 SF of shell construction for future offices and classroom space. Ward needed to keep the existing 40,000 SF school and 6.5 acre site fully operational throughout construction. There were two phases to this project. The first phase was 10 weeks long and required the relocation of a 60 foot bell tower and electrical main service relocation before the foundations could begin. Also there was a significant challenge in tying together all the different architecture and levels. The project included: site work, demo of existing buildings, maintaining access to the play fields and parking lots. Construction of new: concrete foundation, steel frame, detail veneer brick work, casework and millwork, wood doors, EPDM roof, cement fiber board siding, drywall finished, ceramic tile, resilient flooring, carpet, mechanical, fire protection and electrical with a full lighting control system.