Kent Denver SchoolEnglewood, Colorado
Client
Kent Denver School
4000 East Quincy Avenue, Englewood, CO 80110
Contact: Sally Cummings (since retired – please see reference letter), (303) 770- 7660, Ext. 230
Architect
Hutton Architecture Studio
70 Broadway, Suite 300, Denver, CO 80203
Contact: Paul Hutton (303) 861-1600
Project Information
Use: 6th grade school through high school
Type: Addition/Remodel
Size: 13,000 SF Addition/20,000 SF Remodel
Original Contract Amount: $1,452,215
Final Contract Amount: $1,532,000
Project Duration: March 1997 to August 1997
Project Manager: Paul Sommer
Superintendent: Greg Thompson
Method of Delivery: CM/GC
Project Address
Kent Denver School
4000 East Quincy Avenue
Englewood, CO 80110
Description
Ward Construction Co. was selected as CM/GC for the prestigious Kent Denver private school. The design included brick additions, which enhance two focal points of the campus: the Field House and the Main Entry/Common area. A state-of-the-art equipment room highlights the Field House addition. The equipment room looks out over the campus play fields through large windows set in a curved wall, which receives much natural light from a tiered clerestory structure. The addition at the Main Entry/Common, with its illuminated skylight and brick arches, creates a central point for gathering.
