Peak to PeakPeak to Peak Charter School
Boulder Valley School District
Lafayette, Colorado

Client
Prairie View, Inc.
800 Merlin Street, Lafayette, Colorado 80026
Contact: Paul Saporito at (303) 443-8605

Architect
Anderson Mason Dale
1615 Seventeenth Street,
Denver, Colorado 80202
Contact:  Jim Miller, by phone (303) 294-9448, by e-mail – jmiller@amdarchitects.com

Project Information
Use: Kindergarten through Grade 12
(with two gyms and auditorium addition)
Type: New Construction
Size: 104,000 SF
Original Contract Amount: $10,249,529
Final Contract Amount: $11,084,734
Project Duration: October 2001 through
August 2002
Project Manager: Stan Ward
Superintendent: Greg Thompson
Method of Delivery: CM/GC

Project Address
Peak to Peak Charter School
800 Merlin Street
Lafayette, Colorado 80026

Description
Ward was selected for this K-12 school through an interview process; started preconstruction services at the schematic design level and committed to a GMP at D.D.'s to assist in the funding associated with the owner's need to sell bonds.  This fast track school was ground-up on a 25-acre site, and was permitted through the State of Colorado.  The project consisted of full site work, including parking lots, site concrete, athletic facilities (with a soccer field and basketball courts), landscaping, and site utilities.  Three separate buildings were constructed: a two-story high school classroom building; a two-story middle/elementary school building; and a gymnasium/dining building.  Extensive site structural fill was required before foundations (footings) could start.  The classroom buildings were predominantly wood framed to assist with schedule and costs.  Exterior finishes included decorative block, synthetic stucco, standing seam metal and EPDM roofing and asphalt shingles.

 